Ethiopia • Addis Ababa

    Site analysis in Addis Ababa

    An introduction to site analysis in Addis Ababa, covering planning context, common constraints, climate, terrain and transport. Use this city overview to identify what needs checking at the specific site.

    Use this overview to plan your research. Verify current requirements and site-specific conditions against the relevant primary sources. Read our data sources, coverage and limits guide.

    Planning regime

    Addis Ababa City Structure Plan 2017-2027 + Building Proclamation 624/2009

    Key constraints

    • Entoto mountain ridge
    • Steep eucalyptus-clad slopes
    • Aviation surfaces Bole
    • Riverine valleys flood-prone

    Climate context

    Cwb subtropical highland. 2110 hrs sunshine. 1200mm rainfall. Mild year-round at 2355m altitude.

    Topography

    Highland 2200-2600m AOD on Ethiopian Plateau.

    Transport spine

    Addis Ababa Light Rail 2 lines (first sub-Saharan), Anbessa bus, planned BRT.

    Building height context

    Commercial Bank of Ethiopia HQ 209m (tallest E. Africa). CMC Real Estate. Most centre 6-12 storeys.

    Notable recent projects

    • Sheger Park / Friendship Square
    • Adwa Victory Memorial
    • Addis Ababa Riverside Project
    • Lebu industrial park

    Questions

    What planning policies apply in Addis Ababa?

    Addis Ababa City Structure Plan 2017-2027 + Building Proclamation 624/2009

    What are the most common site constraints in Addis Ababa?

    Entoto mountain ridge. Steep eucalyptus-clad slopes. Aviation surfaces Bole. Riverine valleys flood-prone.

    Can Atlasly run a site analysis in Addis Ababa?

    Available site information depends on the address and data source. Start with the site location and review the returned sources and coverage before using the results.

    Run a site analysis in Addis Ababa

    Start with a site location, review the available evidence and identify the checks needed for your next design decision.

    Open Atlas AI

    Review current plans and usage and source coverage for your project.