Planning Application Costs in England: April 2026 Fees
Estimate an English planning application fee using the April 2026 schedule, identify the correct category and separate the application fee from surveys and other costs.

Quick answer
From 1 April 2026 in England, an application to enlarge, improve or alter one existing dwelling costs £548. Full applications for fewer than 10 new dwellings cost £610 per dwelling; 10–50 cost £659 per dwelling. Other categories and larger schemes have different rules. Scotland, Wales and Northern Ireland use separate schedules.
A planning fee estimate starts with the application route, the nation and the submission date. A householder extension, creation of flats and a change of use can look similar on a brief but fall into different charging categories. This guide covers England and the official rates effective from 1 April 2026, checked on 12 September 2026. It replaces the outdated rates previously shown here.
Keep the statutory application fee separate from professional fees, surveys, pre-application advice, building control charges, planning obligations and any submission-service charge. Those costs need their own scope and quotation.
The current fee bands and worked examples
The official April 2026 schedule sets these selected rates:
| Application | Fee |
|---|---|
| Alteration or extension to one existing dwelling | £548 |
| Full application: fewer than 10 new dwellings | £610 per dwelling |
| Full application: 10–50 new dwellings | £659 per dwelling |
| Full application: more than 50 dwellings | £32,578 plus £196 per dwelling over 50; maximum £427,537 |
Three new dwellings: 3 × £610 = £1,830. Ten: 10 × £659 = £6,590. Sixty: £32,578 + 10 × £196 = £34,538. The over-50 band uses its stated base, not 50 multiplied by the preceding rate. These examples assume a straightforward full application without a fee exemption or additional chargeable category.
Identify the chargeable proposal before calculating
Write a one-sentence description of the works and the existing lawful use. Confirm whether the application is householder, full, outline, reserved matters, prior approval or another consent. Creating an additional dwelling is not covered by the single-dwelling alteration fee. Do not infer the application route solely from a front door, kitchen or marketing description.
For an outline proposal, establish the relevant site area and category. For floorspace-based categories, use the area definition in the regulations and the correct rounding increment. Do not interchange gross external area, gross internal area and net lettable area. Record the drawing revision behind the measurement so an amended design can be recalculated.
Mixed, hybrid and other applications
Outline, non-residential floorspace, change of use and prior approval have their own bands. Do not apply the new-dwelling table to them. Nor should you assume that every mixed or hybrid proposal is charged by simply adding two full fees: the fee regulations contain combination rules and caps. The April schedule itself flags an issue concerning the indexation of certain outline applications under regulation 14(2). Confirm an affected calculation with the authority.
Listed building consent itself has no application fee in England; associated planning permission and professional work may still cost money. Tree applications are another reason a generic “all consents cost a fee” assumption fails. Use the fees guidance for the actual category, reductions, exemptions and refund rules.
Resubmission and changing rates
Do not promise a free second application after withdrawal or refusal. The general “free go” exemption was removed on 6 December 2023, subject to transitional provisions for earlier applications. A fresh 2026 proposal should not be budgeted as free merely because it resembles a refused proposal. The 2023 amending regulations explanatory memorandum explains the change.
The April 2026 indexation was 3.8%; it was not a new 35% blanket uplift in late 2025. Date the estimate, retain its source and check the rate again before submission. If a long programme crosses a future annual update, show an allowance separately rather than presenting an unknown future fee as fixed.
Use the calculator as a scoped estimate
The Atlasly planning fee calculator supports selected English application categories. Enter the proposal type and the units it requests; read the rate date and exclusions beside the result. If the scheme needs a category, combination rule, exemption or concession outside that scope, work through the official schedule and confirm the calculation with the authority.
Send the client the calculation with its assumptions: nation, submission date, application category, dwelling count or measured area, any additional categories and the supporting drawing revision. That makes the estimate reviewable. A calculator does not determine the lawful application route or guarantee validation.
Illustrative example
Illustrative scenario: A practice checks the current official fee schedule when scoping an application and again before submission. It records the calculation date, application type and any assumptions instead of relying on an older saved quotation.
Frequently asked
Are these fees UK-wide?
No. This article covers England. Check the respective national regulations for Scotland, Wales and Northern Ireland.
What is the 2026 householder application fee?
From 1 April 2026, enlargement, improvement or alteration of a single existing dwelling in England is £548. Ancillary works within a dwelling’s curtilage can fall into a separate category; confirm the proposed works.
Is listed building consent free?
The application for listed building consent has no fee in England. Planning permission, surveys and professional services are separate.
Is outline always cheaper?
No. Compare the applicable site-area fee and later reserved-matters charges with the full-application route for the actual proposal. There is no universal saving.
Does the calculator guarantee validation?
No. Correct fees are one part of an application. The authority must also consider the required forms, plans and supporting information.
Conclusion
Treat the fee as a dated calculation attached to a defined proposal. Check the category before the arithmetic, record rounding and caps, and revisit the calculation before submission. Use the calculator for supported cases and the official schedule for exceptions.

About the author
Shatakshi Patil
Architect writing about pre-construction due diligence, planning context, and site intelligence workflows for design teams using Atlasly.
Sources and references
Authoritative references for the planning policies, regulations, and standards referenced in this article. Always check the publisher for the latest version.
Related articles
Auto-suggested
planning compliance checker UK
Planning Readiness Checks: Reviewing Site Evidence Against Current Policy
How to organise England planning evidence, verify current policies and distinguish a desktop finding from a compliance conclusion or planning decision.
Read
pre-construction site analysis
Pre-Construction Site Analysis: The Complete Guide for Architects and Engineers
A comprehensive guide to zoning, flood risk, solar, topography, transport, demographics, reports, and CAD-ready outputs in pre-construction workflows.
Read
Tool comparison
How UK Architecture Practices Can Evaluate Atlasly and PlanningBot
A practical trial checklist for UK architecture practices evaluating Atlasly and PlanningBot, with observable acceptance criteria and published-source boundaries.
Read
Planning
Which Planning Reports Will Your Site Need? A Constraints-Led Checklist
The supporting documents a UK planning application needs are decided by the site, not by the scheme. This works backwards from the constraints on a site to the assessments a validation checklist will ask for, and shows how to settle the list before you quote a fee.
Read