    site feasibility study checklist

    Site Feasibility Study Checklist: 12 Things to Assess Before Your Design Brief

    A practical 12-point checklist covering planning, physical, environmental, access, and viability factors that should be tested before briefing design work.

    ·3 min read·By Shatakshi Patil, Architect

    Quick answer

    Before writing the design brief, test 12 basics: planning context, overlays, flood risk, heritage and ecology, topography, access, solar orientation, neighbouring conditions, utilities assumptions, buildable area, transport performance, and exportable evidence. A feasibility study is useful only when it tells the team whether the proposed brief is realistic, weak, or needs to change before concept design starts.

    The best feasibility studies are not verbose. They are decisive.

    They tell the architect whether the brief still makes sense after the site is read properly. That matters because clients often arrive with a programme, a unit count, or an ambition level that sounds plausible until the site conditions are tested against it.

    Which checks can invalidate the brief fastest?

    These are the first four:

    1. Planning status and allocation
    2. Flood and environmental risk
    3. Heritage and ecology triggers
    4. Access and servicing reality

    If any of those four are materially worse than expected, the rest of the brief usually needs rethinking anyway.

    Which 12 checks provide a starting point for early feasibility?

    Use this as the base checklist:

    1. planning designation and policy context
    2. overlays and special review triggers
    3. flood and drainage risk
    4. heritage, ecology, and biodiversity constraints
    5. topography and likely retaining implications
    6. site access and servicing geometry
    7. solar orientation and overshadowing risk
    8. neighbouring buildings and interface sensitivity
    9. transport and walkability performance
    10. utilities or infrastructure assumptions
    11. likely buildable area after constraints
    12. whether the output is strong enough to brief the design team

    That last item matters more than teams think. A feasibility study that cannot be shared and reused becomes another dead document.

    How should architects turn the checklist into a go or no-go tool?

    Each item should record the source and one of four provisional outcomes:

    • supportive on the available evidence
    • manageable with a defined change
    • material risk
    • unverified or insufficient evidence

    That forces the architect to stop describing the site and start judging it. A conservation setting issue may be manageable with massing change. A flood-access failure may be a material risk. An unresolved station route needs further evidence; it should not be marked supportive merely because a particular parking assumption has been dropped.

    What should the feasibility output look like?

    A good output is short:

    • one-page summary of opportunities and risks
    • mapped constraints and movement layers
    • note of what needs specialist verification next
    • available outputs, with format and accuracy checks needed before reuse

    Review these findings alongside pre-construction due diligence, planning constraints, export to AutoCAD and Revit, and the full pre-construction site analysis workflow.

    Define the decision and wider scope

    The twelve checks are a starting structure, not complete legal or commercial due diligence. Add title and rights, contamination, cost, market, funding and programme questions where material. Agree who can accept each residual risk. An unresolved input should stay visible even if a preliminary option appears attractive.

    Illustrative example

    Illustrative scenario: A client requests more floor area. The team records access, height and area assumptions separately, tests alternative options and retains unresolved constraints before agreeing a revised brief.

    Frequently asked

    What is the purpose of a site feasibility study?

    To test whether the proposed brief still makes sense once the planning, physical, environmental, and movement realities of the site are known.

    What should be checked before writing the design brief?

    Planning context, constraints, flood, access, topography, solar, neighbouring conditions, transport, utilities assumptions, and likely buildable area.

    How detailed should feasibility be before concept design?

    Detailed enough to expose the main risks and opportunities, but not so detailed that the team mistakes early intelligence for final consultant sign-off.

    What is the biggest mistake in feasibility studies?

    Describing the site without judging what the findings mean for the actual brief.

    What makes a feasibility study useful to the wider team?

    A concise summary, traceable evidence, explicit gaps and outputs whose suitability for the next stage has been checked.

    Conclusion

    A site feasibility study should not just confirm that the team has looked at the site. It should reveal whether the current brief still deserves to survive. That is the point of the exercise.

    Use Atlasly to organise the available site evidence, and obtain missing searches, surveys or specialist assessments separately. This checklist does not establish that all twelve topics are automatically covered.

    Atlasly

    About the author

    Shatakshi Patil

    Architect writing about pre-construction due diligence, planning context, and site intelligence workflows for design teams using Atlasly.

    Sources and references

    Authoritative references for the planning policies, regulations, and standards referenced in this article. Always check the publisher for the latest version.

    1. 1Measured Surveys of Land, Buildings and Utilities· RICS
    2. 2An Introductory Guide to Multi-Criteria Decision Analysis· Government Analysis Function

    Related articles

    Auto-suggested